Large-load interconnection
A city-sized load on a commercial schedule.
A single data center campus can ask for more power than a mid-sized city, and it needs it on a date, not a decade. The grid was never built to say yes that fast.
Dashiell solves the interconnection from both sides of the fence. We engineer and build the utility-owned switchyard to the interconnecting utility's own standards, because we have been building to those standards for decades. Then we build the customer-owned substation next to it. One team, one schedule, one point of accountability from 765 kV down to the fence line.
Speed comes from repetition. Standard designs, proven with hyperscale customers, let us release long-lead apparatus early and build the same way every time. The result is an energization date that holds.
Dacon construction
PWR AI™: Powering the next wave of load growth
PWR AI™ is Dacon's construction offering for large-load power infrastructure. Dacon brings together substation and transmission construction, civil and foundation work, conductor installation, and construction project management to move complex interconnections from the field plan through energization.
In the field, repeatability becomes execution certainty. Proven construction plans, field sequencing and experienced crews support consistent delivery from project to project and a more predictable path to energization.