Baytown & Mont Belvieu, Texas NAG High Voltage Supply Project

Scope One

  • (1) 138kV 4 Mile Steel Structure Dual Circuit Transmission Line
  • (1) 138kV 4 BKR Ring Substation
  • (2) 138/35kV 80 MVA Power Transformers
  • (1) Lot 35kV GIS Switchgear in Elevated PCR Type Building

Scope Two

  • (1) Expand 138kV 4 BKR Ring to 6 BKR Ring Substation
  • (1) 138kV 2 Mile Steel Structure Dual Circuit Transmission Line
  • (1) 138kV 4 Breaker Ring Substation
  • (2) 138/15kV 80 MVA Power Transformers
  • (1) Lot 15kV Metal Clad Switchgear in Cinder Block Building

Enterprise Customer Owned Utility Tie Subs

  • Multiple 138kV 4 Breaker Ring Bus Substations
  • Includes two (2) Redundant Transformers
  • Typically includes a Control House with a Lineup of MV SWGR for Load Tie Ins
  • Projects are completed on Time Ahead of Utility Outage Dates
  • Ever Changing Utility Specifications are Accounted for in Every Design

Centurion Pipeline Midland Project

  • 138/12.47kV Tap Substation
  • Includes two (2) Redundant Transformers
  • Control House with lineup of 12.47kV SWGR
  • 12.47kV Pole Line through the Facility
  • Cutover of New and Existing Loads to the new Transmission Substation