Project Details

Completion Date: 2018

Location: Utah

EPC Scope:

  • (2) – 138kV Generation Tie Lines
  • (3) – 138/34.5kV Collector Substations (3 separate PPA’s)
  • (1) – 138kV Switching Station – Build Transfer to Utility
  • (1) – 138kV Metering Yard