EPC Scope:
EPC Scope: (3) – 230kV Generation Tie Lines including POCO switch pole (3) – 230/34.5kV Collector Substations (3 separate PPA’s) (1) – 230kV Switching Station
View ProjectEPC Scope: (2) – 230kV Generation Tie Lines including POCO switch pole (3) – 230/34.5kV Collector Substation Full Telecom Scope including Cellular and Microwave Connections