Tranquility 8

EPC Scope:

  • (3) – 230kV Generation Tie Lines including POCO switch pole
  • (3) – 230/34.5kV Collector Substations (3 separate PPA’s)
  • (1) – 230kV Switching Station

Granite Mountain

EPC Scope:

  • (2) – 138kV Generation Tie Lines
  • (3) – 138/34.5kV Collector Substations (3 separate PPA’s)
  • (1) – 138kV Switching Station – Build Transfer to Utility
  • (1) – 138kV Metering Yard

Copper Mountain

EPC Scope:

  • (2) – 230kV Generation Tie Lines including POCO switch pole
  • (3) – 230/34.5kV Collector Substation
  • Full Telecom Scope including Cellular and Microwave Connections