HomeProjects Explorer

Projects

2017
Baytown & Mont Belvieu, Texas NAG High Voltage Supply Project

Scope One (1) 138kV 4 Mile Steel Structure Dual Circuit Transmission Line (1) 138kV 4 BKR Ring Substation (2) 138/35kV 80 MVA Power Transformers (1)...

View Project
2013
W.A. Parish Peaker Project

138kV Switchyard and Transmission Line

View Project
2011
Blue Creek Wind Farm

345kV Interconnect Switchyard

View Project
2011
Cedar Creek II Wind Farm

230kV Interconnect Switchyard 230/34.5kV Collection Substation 230kV Transmission Line

View Project
2010
Hatchet Ridge Wind Farm

One 230kV, 2000A gas circuit breaker One 230kV/34.5kV 75/100/125 MVA power transformer Five 38kV, 1200A vacuum circuit breakers Two 34.5kV 10 MVAR capacitor banks

View Project
2017
Baytown & Mont Belvieu, Texas NAG High Voltage Supply Project

Scope One (1) 138kV 4 Mile Steel Structure Dual Circuit Transmission Line (1) 138kV 4 BKR Ring Substation (2) 138/35kV 80 MVA Power Transformers (1)...

View Project
Completed Over the Last 50+ Years
Enterprise Customer Owned Utility Tie Subs

Multiple 138kV 4 Breaker Ring Bus Substations Includes two (2) Redundant Transformers Typically includes a Control House with a Lineup of MV SWGR for Load...

View Project
2020
Centurion Pipeline Midland Project

138/12.47kV Tap Substation Includes two (2) Redundant Transformers Control House with lineup of 12.47kV SWGR 12.47kV Pole Line through the Facility Cutover of New and...

View Project
Back to Top