Tranquility 8

EPC Scope:

  • (3) – 230kV Generation Tie Lines including POCO switch pole
  • (3) – 230/34.5kV Collector Substations (3 separate PPA’s)
  • (1) – 230kV Switching Station

Granite Mountain

EPC Scope:

  • (2) – 138kV Generation Tie Lines
  • (3) – 138/34.5kV Collector Substations (3 separate PPA’s)
  • (1) – 138kV Switching Station – Build Transfer to Utility
  • (1) – 138kV Metering Yard

Copper Mountain

EPC Scope:

  • (2) – 230kV Generation Tie Lines including POCO switch pole
  • (3) – 230/34.5kV Collector Substation
  • Full Telecom Scope including Cellular and Microwave Connections

138kV Breaker and a Half SWYD

Engineering and Construction Services:

  • Four (4) Bays
  • Five (5) Lines Coming In and Out
  • Included Current Limiting Reactors

115kV, 230kV, and 345kV Projects

EPC Scopes:

  • (2) – 345kV 3 breaker ring SWYD expandable to a future BAAH
  • (1) – 115kV 3 Bay BAAH SWYD
  • (1) – 115kV 3 breaker ring SWYD
  • (2) – 345kV SWYD Expansions
  • (1) – 345kV 3 Bay BAAH SWYD
  • (1) – 115kV SWYD Expansion

Lake Charles Transmission Project

EPC Scope:

  • (1) – 500kV 3 breaker ring switching station
  • (1) – 500kV Transmission Line – 6 miles
  • (1) – 500/230kV Switching Station
  • (3) – 230kV Lines – Greenfield/Rebuild – 23 miles
  • (5) – 230kV Substation Expansions/Modifications
  • (1) – 230kV River Crossing Demo/Rebuild – Including Explosive Demolition

Delaware Basin New Mexico High Voltage Supply Project

Scope One

  • (1) 115kV 7 Bay BAAH Switchyard
  • (2) 115/25kV 37MVA Power Transformers
  • (2) Lot 25kV Switchgear and PCR Type Building
  • (1) 115kV 4 Mile Transmission Line

Scope Two

  • (1) 115kV 2 Bay BAAH Substation
  • (2) 115/25kV 30MVA Power Transformers
  • (1) Lot 25kV Switchgear and PCR Type Building
  • (1) 115kV 6 Miles Dual Circuit Transmission Line

Scope Three

  • (1) 115kV (2) Breaker Double Tap Substation
  • (2) 115/25kV 30MVA Power Transformers
  • (1) Lot 25kV Switchgear and PCR Type Building
  • (1) 115kV 3 Mile Dual Circuit Transmission Line

Sweeny, Texas High Voltage Supply Project

Scope One

  • (1) Expand Existing 138kV BAAH Substation
  • (1) 138kV 6 Mile Steel Structure Dual Circuit Transmission Line
  • (1) 138kV 6 Breaker Ring Substation
  • (2) 138/35kV 80MVA Power Transformers
  • (1) Lot 35kV GIS Switchgear in Elevated PCR Type Building

Scope Two

  • (1) Expand 138kV 6BKR Ring to 8 BKR Ring Substation
  • (1) 138kV 2 Mile Steel Structure Dual Circuit Transmission Line
  • (1) 138kV 4 Breaker Ring Substation
  • (2) 138/35kV 80 MVA Power Transformers
  • (1) Lot 35kV Metal Clad Switchgear in Cinder Block Building

Scope Three

  • (1) Expand 138kV 4 BKR Ring to 6 BKR Ring
  • (1) 138kV 2 Mile Steel Structure Dual Circuit Transmission Line
  • (1) 138kV 4 BKR Ring
  • (2) 138/35kV 60MVA Power Transformers
  • (1) Lot 35kV Metal Clad Switchgear in Elevated PCR Type Building

Scope Four

  • (1) Expand 138kV 4 BKR Ring to 6 BKR Ring
  • (2) 138/35kV 60 MVA Power Transformers
  • (1) Lot 35kV Metal Clad Switchgear in Elevated PCR Type Building

Scope Five

  • (1) 69kV 4 BKR Ring Substation
  • (1) 69kV Transmission Line Cut-in for Three Terminal Station
  • (2) 69/15kV 60MVA Power Transformers
  • (1) Lot 15kV Metal Clad Switchgear in Elevated PCR Type Building
  • (1) Lot 15kV Insulated Power Cable Distribution Lines on steel structures approx. 6 Miles

Baytown & Mont Belvieu, Texas NAG High Voltage Supply Project

Scope One

  • (1) 138kV 4 Mile Steel Structure Dual Circuit Transmission Line
  • (1) 138kV 4 BKR Ring Substation
  • (2) 138/35kV 80 MVA Power Transformers
  • (1) Lot 35kV GIS Switchgear in Elevated PCR Type Building

Scope Two

  • (1) Expand 138kV 4 BKR Ring to 6 BKR Ring Substation
  • (1) 138kV 2 Mile Steel Structure Dual Circuit Transmission Line
  • (1) 138kV 4 Breaker Ring Substation
  • (2) 138/15kV 80 MVA Power Transformers
  • (1) Lot 15kV Metal Clad Switchgear in Cinder Block Building